WordPress’s image editing suite is kind of janky so as much as I’d like to rotate that top image, it ain’t happening. Anyhow, new clutches installed.
Through-hulls for cockpit drains installed, and the muffler hooked up. I wish those bolts weren’t so long but if I cut them off the nut falls off when I loosen it enough to take it off.
I did cut the extra bolt off here because I thought it’d interfere with adjusting the packing nut. New stuffing box installed.
Here you can see the new through-hulls, valves, and hoses in place. Way nicer than what was there before.
Muffler and packing gland. Once I get the throttle/shifter cables in the engine can go back in. Can’t wait.
Now that’s how a boat should be put together. Very nice looking hardware.